[ad_1]
Monday, July 02, 2018 06:16
The transit will be cut all day from Monday 24 to Sunday, between Salta and Junín. The cut is due to a demolition ordered by the civil defense of the province to the owner of a building that is in poor condition and which represented a high risk for security, as explained by the owner of the area, Jorge Sepúlveda.
a two-storey property where operates a maxikiosco and the floor is uninhabited . The building is located just in front of the school of Rivadavia so will not be able to access school transport nor will it be able to park vehicles during the construction period.
[19659005] "A retiree who went to collect the Bank of Santiago warned that the upper floor had an important crack and put us in a state of alert . I asked for reports from our technical team, and they stated that there was a risk. We do not want another misfortune to happen like that of Parravichini . maxikiosco that every day school children to buy, "said Sepúlveda.
According to the official, immediately urged the owner to demolish the upper floor, who is the one who is in danger of collapse and the owner of the property agreed without major issues. "All this happened last week, there is already permission to demolish, we work all weekend and tomorrow we finish the job."
Ex Banco Francés
In the San Martín at 700, meanwhile, there will also be preventive work but in this case – at least in principle – it will not be necessary to cut the street. Today, work will begin to consolidate the front of the old Banco Francés, which is in the hands of the Caja Popular de Ahorros and which also presents risks of collapse.
Source: https://www.lagaceta.com.ar/nota/776008/actualidad/permanece-cortada-durante-todo-dia-calle-24-septiembre-al-800.html
->
<! –
->
Most read in the week
[ad_2]
Source link