Shipyard The star is getting ready to put into service a dry dock. Video report of Xenia Kolchina



[ad_1]

Ksenia Kolchina, correspondent: "On the eve of the berthing of the shipbuilding complex" Zvezda "has docked this floating dock.It will build ships of such size and such a clbad on the seaside shipyard that were previously ordered only abroad. "

Parts for the Aframax tanker have already been cut in the factory workshops. This is the first order of large tonnage from a new shipyard. The new dock of the ship is only one dimension: its length is 258 meters, and there were no such tankers in Russia yet. Ice ships are also under construction. "Star" should provide the country with naval equipment for work on the continental shelf.

Sergei Tseluiko, general manager of the shipbuilding complex "Zvezda": "These are Arctic shuttles and shallow icebreakers.Today, the order book of the shipbuilding complex Zvezda is 25 orders. "

A year ago there was a vacant lot, and now the construction of the second floor of the plant is in full swing. For the coastal shipyard there will be no impossible tasks.

Denis Ovchinnikov, Deputy Director of the construction of the 2nd stage of the SSK "Zvezda": "The possibilities of dry dock are limited by its dimensions: 485 meters long, 110 meters wide meters – a project Any ship can be built this size, but such ships do not exist yet in the world and we will probably build first here. "

The equipment and plans are grandiose, but they are remember first employees: as soon as the construction site is completed 7000 people will work at the factory, so that production workshops under construction "catch up" with residential buildings. After 5 years, a whole microdistrict for shipbuilders will grow here.

[ad_2]
Source link