[ad_1]
Source: Rossiyskaya Gazeta
On the M-4 "Don" highway, 90 video cameras with traffic lights are displayed at payment points. For those who have paid the price, they turn on a green light, and one who wants to slip behind him – red. The cameras set the pbadage at the traffic ban signal, which is already a violation of the Traffic Rules
Last year, such a system was tested on the 545th kilometer of the M-4 "Don" highway. The number of "rabbits" fell only 20 times, said the head of "Avtodor" Sergei Kelbakh, answering the question of a correspondent of the "Rossiyskaya Gazeta": "It turns out that this 39; is a very effective way to fight hooligans.The price of the red light is one thousand rubles.Reiter fine – five thousand. "
The system of fines for" rabbits "will be distributed to all roads that are in the administration of Avtodor. On the roads where the fare is paid according to
The M-4 highway is actively developing. It is planned to bring the quality level of "Don" in the Rostov region to the same level as in Voronezh. In particular, the detour of Aksay is being built in the Rostov region. In the region, with the governor, it was decided to create a permanent working group for the implementation of the M-4 reconstruction project, skirting the city of Aksai, said the chief of staff. Avtodor
Rostov-on-Don. rebuilt outside of the schedule. According to Sergey Kelbakh, the project already exists, the decision to redistribute boundaries to start work is also accepted
An important decision was made in Krasnodar territory on two crossroads in Gelendzhik, documents are in preparation for Glavgobadpertiza. This year, Avtodor intends to hold a competition and begin construction of two intersections between 1504 km and 1515 km from the M-4 motorway at Gelendzhik, which will remove transit traffic from the city seaside. In the plans – the pose of a far west bypbad of Krasnodar. The project is coordinated by Glavgobadpertiza
In the next 3-5 years will be built a new Krasnodar-Abinsk-Novorossiysk road, which will be connected to the new road to Tsemdolin (a microdistrict in the Primorsky district of Novorossiysk). This will help divide the transit traffic in the south of Russia into two watercourses in front of Krasnodar: one to Novorossiysk and Crimea, the other to Dzhubga and Sochi. "If we implement these projects, the South of Russia will receive a completely different economy," says Avtodor's boss. The laying of the tracks is in line with the development program of the ports of the Black Sea Basin and the railways which serve them
Other problem areas have to be rebuilt at M-4. In the Tula region, road builders promise to remove the "roller coaster" from 222 to 225 km. In
The narrowest stretch on the highway lies between the village of Losevo and the town of Pavlovsk. Work on its expansion will be accelerated, promised Kelbakh.
A new section of the road M-4 "Don" of a length of 85.17 kilometers will cross the districts of Bobrovsky, Pavlovsky and Verkhnemamonsky of the Voronezh region. This means that the road will become a four-lane road with separate counter-currents and interchanges at different levels. The estimated speed will be 120 kilometers per hour, promise the road builders.
In parallel, the road service for motorists will develop. It will appear as large multifunctional areas, similar to the 249th km in the Tula region, as well as small cafes along the road. For this year, it is planned to introduce four other joint projects with the formation of small cafes on recreational areas on the M-4 Don road.
Source link