Bulgaria wants offers from 7 countries for fighters



[ad_1]

F / A-18E / F Super Hornet is one of the fighters for whom the OM requests an offer from the United States

The Bulgarian Ministry of Defense intends to Send to seven countries a request / request for supply of upgraded fighters of the occasion of the amount of 1.8 billion BGN, which emerges from an investment project updated for the acquisition of a new type of combat aircraft approved by the National Assembly on June 8, 2018, announced by the agency. end of 2018 to declare a delivery procedure and three battalions battalions for the needs of ground forces of a total value of 1.464 billion levs

The Ministry of Defense intends to address an offer in the United States, Portugal, Israel, Germany, France, Italy and Sweden. is for bids for the all-new F-16 block 60 (or 70) or F / A-18E / F Boeing Super Hornet company, and for fighter jets of opportunity interest in F-16, upgraded to variant OFP M6 one with equivalent capabilities), or F / A-18E / F Super Hornet or F / A-18C / D Hornet updated to a Super equivalent A brand new aircraft offer will be requested by Dbadault Rafale, flown by President Rumen Radev during his visit to France, and recommended to the Cabinet to consider the possibility of such a delivery.

The Swedish Saab is waiting for the new Gripen C / D and the Gripen C / D to be modernized in the current configuration of the NATO Member States (Hungary and Czech Republic)

Proposal for a new Eurofighter Tranche 3 will be solicited from Germany

From Portugal it is planned to offer logistic packages and US armaments F-16 MLU OFP M6 (Third Party Transfer)

Survey in Israel is used for F- 16 C / D (Third Party Transfer) upgraded to OFP M6 (or equivalent). The inclusion of Israel as a supplier was proposed by the Minister of Defense Krasimir Karakachanov

Also used Eurofighter Tranche 1 is requested from Italy

In the previous procedure for the supply fighters to replace the current The Russian LAG-29 was declared Swedish Saab with Gripen machines. its competitors ranked second in Portugal's offer for used US F-16 fighters. The third offer was Italy, which also proposed the Eurofighter used

The Ministry of Defense indicates that, depending on the final choice of the type of aircraft (respectively the supplier country), there is three combinations of contracts for the realization of the project. The first is a single state contract for the provision of aircraft, clbadified equipment, ground handling equipment, weapons, training devices. and training. The second – contracts with one country for the delivery and training of one aircraft and another – for the supply of clbadified equipment, ground handling facilities, installations of 39, training and weapons. The last option involves the purchase of equipment and weapons clbadified by several countries

Whatever the combination of contracts used for the implementation of the first phase of the project, the total value of all contracts – for delivery by air, ground handling aids, training and training facilities and armaments will not exceed the financial framework set at BGN 1.8 billion with VAT, indicates the project.

Plans for combat aircraft to be provided must be performed equally in two stages and six consecutive years beginning no earlier than twelve months after the conclusion of the contract with the selected supplier. However, it is also possible to acquire more machines in the first stage. The reasoning is that the acquisition of an additional amount of aircraft of the same type and in the same configuration after 6 to 7 years will accompany significant difficulties and risks, the possibility of ## 147 ## 39, buy, if the price of the aircraft and equipment allows for a greater number of aircraft during the first stage in the predefined financial framework for this phase.

After delivery of the aircraft, the MiG-29 weapons will be removed. A new capital cost project is planned for the second phase

The estimated annual costs of integrated logistic support should be in the range of 30 to 40 million BGN, with an annual total of 1500 hours. . These expenses will be provided after the third year of the budget of the Ministry of Defense and are not part of the current project of investment expenditures, notes the agency.

The battalion battle group project will also be implemented in two stages. The first will receive 150 combat and special equipment for three of these groups. You have to get up for eight years. It is planned to buy at least 90 armored combat gear for a mechanized compartment and no less than 60 special armored vehicles (supply and maintenance). A training system (simulators, simulators, documentation, etc.), an automated fire control system for a self-propelled mortar battery (ASUSOM) for 3 battle groups and a communication and information system for them will be acquired . This requires 1.224 billion levs, according to forecasts based on the responses of potential suppliers

The complete badembly of groups of systems will take another 5 years and will cost 240 million BGN

The plans the Ministry of Defense has until the end of the year to conclude a procurement contract for this armored machine, but the agency leaves a loophole when it is appropriate to apply exceptions to the law on public procurement. ] We will be happy if the
Support us

[ad_2]
Source link