Partial closure of the May 15 bridge to repair joints



[ad_1]

A security source at the General Administration of Traffic in Cairo reported that it was decided to repair and renovate the bridge decks of May 15 from 1am Friday to 8 pm Saturday

The source said work begins Friday at 1am. 2018 at 20:00 Saturday 28 7 2018. The works will include the highest bridge on May 15, at the top of Hbadan Sabri street in the direction of Cairo to Giza, work will turn in the same direction.

Any expected traffic density, with the development of artistic aids

[ad_2]
Source link