[ad_1]
food.
Pbadengers stuck in a train RB 14. Pbadengers report extreme heat and lack of water. A man jumped off the train
The train in Essen was evacuated: several pbadengers collapsed
Only a few hundred meters after leaving Essen Hauptbahnhof, a complete train from the Nordwestbahn (RE 14) left on Thursday after noon with engine failure. In the scorching heat, pbadengers had to endure nearly two hours in both trains before being released from their misery by firefighters
"Five pbadengers, including a pregnant woman, had to be treated for problems circulatory systems ", reports Michael Dörr. shortly after the end of the evacuation at 19 hours
"Pbadengers helped each other with water"
Apparently, a motor or transmission damage was the cause of the l '. incident, which also affected the other rail traffic. Meanwhile, the trains could no longer leave the main station to the west, trains coming from the west with the destination Essen-Hauptbahnhof also staying on the open lane.
The pbadengers state that there was no Nordwestbahn on board staff and the driver was completely overwhelmed had been. Apparently, he made several futile attempts to start the train. When he opened the doors for this, an impatient pbadenger jumped off the train and ran across the tracks. Dorsten pbadenger Ursula Gogol reports that drinking water has become scarce on the train. "The pbadengers helped each other with water."
Apparently, the air conditioning had failed in a train room
According to the director of operations Michael Dörr in one of the two parts of the train, the air conditioning had failed. Pbadengers report that there was a tormenting heat on the train and that information on the Northwest Railway was lacking. The RE 14 ("Der Borkener") leaves from the central station of Essen via Dorsten to Borken.
The engine damage occurred at the premises of the DB factory on the Schederhofstraße at the pressure center of the Funke media group. Here the trains of the Deutsche Bahn are cleaned and repaired
Schederhofstraße had to be completely closed
During the evacuation the Schederhofstraße had to be blocked in both directions by the police. Fire rescue and federal police officers accompanied pbadengers on the distressed train to the meeting point of Schederhofstraße. At the rendezvous, they must be picked up by bus and driven to their destination.
But the majority no longer expects the replacement of the rail after the hour of turmoil in the train and goes away from itself. train traffic after 19 hours completely be released again. But at 19:31, the pbadengers of the Nordwestbahn at platform 9 waited in vain for the "Borkener".
[ad_2]
Source link