Haruna Iddrisu congratulates Akufo-Addo, Government



[ad_1]

Prez Akufo-Addo in a warm handshake with Haruna Iddrisu

The leader of the minority Haruna Iddrisu congratulated the president Nana Addo Dankwa
Akufo-Addo and the government for the initiative to expand Tamale drinking water production facility in Damongo and the surrounding areas of northern Ghana.

The water supply system, he said, will improve the delivery of health care and expand access to safe drinking water in the beneficiary communities.

Haruna Iddrisu praised when a Finance Committee report on a facility agreement and a trade facility agreement between the government and the branch of Deutsche Bank AG in London and UK Export Finance for $ 234 million. Euros and 43.1 million euros, respectively, was presented to the House.

The facilities will fund the design, construction and commissioning of a drinking water infrastructure project in Tamale.

The project, he noted, once completed, would put an end to the difficulties of the inhabitants of Tamale and the Damongo region.

The minority leader said the people of Tamale were struggling because the population of the region had exceeded the production of drinking water.

It is comforting and comforting to know that the government not only intervenes in a treatment plant at Nawuni in Kumbungu, but also in the deduction of water source in Yapei and sites ranging from Gushegu to others. regions. "

He added that an expansion of water in rural areas of Tamale would lighten the burden of rural residents who have a critical need for clean water.

The minority leader, however, asked why the 2008 expansion had failed to meet Tamale's water needs despite huge sums spent on the project.

The volume of water to be produced as part of the current expansion, he said, therefore needs to be critically examined so that the project does not lose its value in the not-too-distant future. remote, resulting in increased demand for drinking water in Tamale.

He praised the extension of the project in Damongo, describing it as a novelty, so that water production does not only depend on Nawuni, but also on the Yapei commission to cover others. communities.

The Finance Committee's report on settlements and trade agreements indicated that Tamale and its surrounding areas were making a significant contribution to the country's agricultural prosperity by producing arable crops, including maize, yam, cbadava, beans and rice.

The existing water supply system for Tamale and its environs was built in 1972 and the purification station is located at Nawuni on the White Volta River.

In 2008, extension works were carried out on the Dalun stem, including the construction of a 20,000 m³ storage tank at Kukuo Yepalsi, which increased the production capacity of the station. purification from 25,000 m³ per day to 44,000 m³ / day.

Due to rapid population growth in Tamale and surrounding areas, demand for water has once again exceeded supply.

As a result, there is an increasing number of residents in Tamale who do not have reliable access to drinking water. And to alleviate the situation, the Ghana Water Company (GWCL) had to implement a water rationing program in the metropolis and surrounding areas.

This project has therefore been proposed to build a new water supply system to meet the demand of Tamale and its surroundings.

[ad_2]
Source link