Take a look at Dukuh Atas MRT Metro Station



[ad_1]

JAKARTA, KOMPAS.com – William P. Sabandar, President of the Jakarta RTM, said the construction of the Dukuh Atas station was almost complete.

The construction of the station has entered its final phase, namely the cleaning of the interior and stairs of the station.

"This Dukuh Atas station is one of the relatively established stations, l & # 39; entryit was also manufactured, "William said at the Upper Hamlet train station on Thursday (29.11.2018).

Kompas.com have the chance to explore Dukuh Atas metro station on Thursday.

To get into the station, there are stairs, escalators and lifts for pbadengers. The location of the stairs is right next to the escalator.

However, Kompas.com can only enter the station by descending 70 steps because the escalator can not be used. The Dukuh Atas station consists of three floors.

Read also: The 12 MRT train series arrives in Jakarta

The first floor, located above ground, serves as a gathering place for pbadengers to use other modes of transport, such as the Transjakarta bus.

Dukuh Atas MRT Station. Photo taken Thursday (29/11/2018).KOMPAS.com/ RINDI NURIS VELAROSDELA Dukuh Atas MRT Station. Photo taken Thursday (29/11/2018).

PT MRT Jakarta has set up a park on the first floor of the station.

In the park part, there is ladder access for pedestrians who wish to get to the bus stop located in the Jalan Jenderal Sudirman section which leads to the Indonesia Hotel roundabout.

There is also ramp or special routes for disabled people to get to the bus stop.

Meanwhile, the second floor of the station seemed to be the center of activity for the pbadengers.

There is a machine tapping to enter the train station, elevator on the ground floor, information room, place to buy tickets and place for the tenants.

However, not all these facilities can be used. Machine installations tapping even the yellow line is always limited.

Entrance to the Dukuh Atas MRT station in central Jakarta. Photo taken Thursday (29/11/2018).KOMPAS.com/ RINDI NURIS VELAROSDELA Entrance to the Dukuh Atas MRT station in central Jakarta. Photo taken Thursday (29/11/2018).

William said, will be built tenant food, drinks, accessories and the fashion on the second floor of the train station.

"There will be here later coffee for workers who want to go out or meeting. There is also a mini-market for pbadengers who want to buy food or drinks. Hopefully this station will stay clean as we will build a station with convenient facilities for pbadengers, "said William.

Read also: Modification of the route of the phase 2 of the MRT, location of the construction of the Depo not decided

Then the ground floor of the train station serves as a boarding and boarding place for pbadengers. Kompas.com We had to go down the stairs because the escalator was still not used.

Toilets are also available on the second floor and on the ground floor of the station. On the floor of the station, it also appears guide block yellow that serves as a guide for people with disabilities.

Project development rapid transit (MRT) in Jakarta reached 97.57% until the end of November 2018.

As planned, the first phase of the Jakarta subway crossing by Lebak Bulus-Bundaran Hotel Indonesia (HI) will be operational in March 2019.

[ad_2]
Source link