[ad_1]
Lithuanian National Drama Theater. Photo by Romualas Jurgutis (LŽ)
After the theater season, some parts of the country's institutions begin to rebuild, some theaters will no longer operate in their premises for several years and promise to perform in other spaces [19659004] Construction will begin here and will last until the autumn of 2020.
According to theater director Martynas Budraitis, 15.3 million. A new small hall of 300 rooms will be built in the inner courtyard of the theater, and a studio of about 100 seats will be set up, aimed at young directors.
The current small hall will be suitable for the production of decorations
Despite the works, Mr. Budraitis states that the fall directory is already planned and that the tickets are already sold.
"It will be just another performance performance is organized according to the principle – it is not usual that the representation of the same name in our rooms be shown once a month, but there will be more performance in Lithuania The season will begin for the Outback market in Lithuania, starting with the Siemens arena, at the Klaipėda Fishermen's Palace, Panevezys Cido Arena, said Mr Budraitis
According to him, at the end of the tour "Exodus", the audience in the big halls will present another performance of Oscar Korshunov, "The Cathedral" and others.
The small hall should take place at least until In the spring
The festival will take place in the city of Anykščiai, the capital of the city of Oslo, which will take place in other cities, as the director's premiere and Norwegian choreographer Jo Stromgren, the State Youth Theater was closed in May. The summer should complete public procurement for the reconstruction of the scene, and it will be completed in May of the following year. In the past, it was expected that the work would cost about 4 million.
According to Audronis Lyčius, the director general of the theater, two years ago, the reconstruction was already starting last year, but the quality of the project was not satisfied because, according to him, some of the envisaged solutions would be "expensive but ineffective". The technical quality of the stage service is of a different level, because in practice everything will be new: the stage and the equipment, the sound, the light and the video equipment. For the productions made here, the directors who work here, at least in recent years, are really strong enough, the Lithuanian and foreign directors should have a well-equipped stage, which we believe the theater should only help "- hopes A. According to him, one year before reconstruction, the theater will take a break – it is planned to make 5-6 trips to other cities of Lithuania by a month
"It is probably good because a lot of politicians talk about going to see the regions – that's what we will try to do, "said A. Liuga
The drama theater Siauliai has already renewed the small hall, it was opened this year. According to theater director Aurimas Žvinis, it is expected that the new season will also be held in September in the large renovated stage.
According to him, the small room is adapted to welcome the public: new sound, lighting, chairs and all the scenic machines. Construction work has been carried out in the Great Hall: renovation of walls, floors, ceilings, electricity, plumbing systems, partially renovated light and sound equipment, but according to A. Žvinio, "far from what is necessary". In total, the theater expects not to spend more than 2 million renewal.
According to Stasys Kriščiūnas, chief theater engineer, BNS announces that a new international purchase will be announced. The reconstruction of the Kaunas musical theater is suspended by the Public Procurement Office next spring, after which the theater will operate at the normal pace. , and the work will take place next season – in April-September. It is planned to update the stage lights, decorative lifts, and install movable floor pillars for the orchestra, in order to enlarge the audience room or stage, if necessary. The sound equipment, the control unit, the artistic lighting system will be updated. It is planned to allocate up to 5 mln.
A new Klaipėda Musical Drama Theater is expected to be built at the end of 2021 – performances are currently taking place at the Fishermen's Palace, the Klaipėda Drama Theater, concerts at the Arts Academy Concert Hall of Klaipėda, visits to Žalgiris Švyturys, Šiauliai, Siemens arena
"As in the past and next season, we will show our performances, musical here," said Jurgita Skiotytė-Norvaišienė
It is expected that 39, after the demolition of the old hall will be built an annex, a large room room will be located there, as well as on two floors, underground rooms will be arranged for rehearsals of an orchestra, from a choir, a ballet.
[ad_2]
Source link