[ad_1]
Cuautitlán Izcalli, Edomex. The Emisor Poniente II (first stage) tunnel, whose work was officially delivered by President Enrique Peña Nieto, will be "fully operational in two weeks", he said.
He also delivered "remote" – that is, from afar – the tunnel under the Canal General Canal and the Los Remedios River Float.
The three hydraulic infrastructure works located in Mexico will improve the operation of the drainage system in the Valley of Mexico by increasing the driving capacity by 144 cubic meters per second.
And the risks of floods due to heavy rainfall in this municipality will decrease, as well as in Atizapán de Zaragoza, Tlalnepantla, Valley Chalco Solidaridad, Ixtapaluca, Nezahualcóyotl, Ecatepec, in the State of Mexico, and at City Hall Gustavo A. Madero, Mexico
During his speech, the Mexican president – with a forehead wound near the right temple that seemed sutured – called on the residents of the Mexico Valley not to worry about the next break in the day. drinking water supply. the National Water Commission (Conagua) from 31 to 3 November, to maintain the Cutzamala system.
"A bigger alarm should not be generated because this maintenance method is used year after year.This is a systemic interview, a daily maintenance, good, not daily, but regular, regular and regular."
The incumbent of the federal executive was reminded that at the beginning of his government cuts of drinking water of 24, 48, 72 and 96 hours had been made to ensure the maintenance of this system, and up to eight times a year.
The cut drinking water, he recalled, was also manufactured last year and admitted that maybe then "we caused less concern because it does not". was not warned, the cut was simply made. "
[ad_2]
Source link