[ad_1]
The next stop on the multimillion-dollar Davao City coastal bypass route from Times Beach to Sta. The Ana Pier area is expected to begin this month.
In an interview on Tuesday, July 10, 2018 with Allan Borromeo, regional director of the Department of Public Works and Highways-Davao, he said that a budget of 3 billion P3 was allocated. The coastal road that will be built in 2018 will link the 2017 project to Bago Aplaya in Times Beach after the project has been awarded to a contractor.
The coastal road, which extends from Matina Aplaya to Sta. Ana Pier, is expected to be completed in 2022 with a total budget of 19 billion pesos for the entire project.
Borromeo assured that they would do their best to speed up the construction of the coastal road in order to "We will do our best to finish this because the traffic in the city of Davao has become a problem and that the coastal road is of great help to remedy this, "he said
. Residents who will be affected by this development, he said that affected families have been properly compensated.
Borromeo said that the four-lane coastal road measures 26 meters with the bike path and sidewalk.
An esplanade, located in Bago Aplaya and Gulf View, will also increase this year with a budget of 300 million pesos
He assured that the cyclists who will use the four-meter bike path are safe and wide enough for cyclists can pass to avoid road accidents. (func tion (d, s, id) {var js, fjs = d.getElementsByTagName (s) [0]; if (d.getElementById (id)) returns; js = d.createElement (s); js.id = id; js.src = "http://connect.facebook.net/en_US/sdk.js#xfbml=1&version=v2.4&appId=1557584214546916"; fjs.parentNode.insertBefore (js, fjs);} (document, & "Script", "facebook-jssdk"));
[ad_2]
Source link