[ad_1]
Until the end of August, drivers will have to rely on speed limits and speed limits on the episode. Cho ready are already roads, panels, barriers or screens, in some places there are also finishing and ordering tasks. This applies, among other services and local vibrations, reconstructed under the contract. The entrepreneur, the company POLAQUA, is also waiting to obtain the necessary permissions. Up to 100 km / h is still used throughout the episode, and in some places there are also additional speed limits
. GDDKiA
S8 fragment of the belt of Ostrów Mazowiecka at the border of Mazovia and Podlasie provinces at 9.4 km in length and runs most of the old meter of the national road No. 8. There are two road sighs: Podborze and Prosienica. Its construction cost about PLN 249 million.For the moment, the section has two lanes in each direction, while in the future it is planned to build a third lane "in the future. ; interior ". There remains a reserve in the road dividing roads
All the S8 highways from Warsaw to Bialystok will be passable to motorists in just a few months At this point, all sections of Podlasie voivodeship are ready, while in the Masovian Voivodeship, two sub-sections are under construction. "Between Wyszków and the beginning of the Ostrów Mazowiecka ring road: Wyszkw – wze Porba (here the exit is scheduled for September / October) and Porba – Ostrw Mazowiecka (delivered in late August plans)
Below the GDDKiA map, while the attention – still in red, not black (as ready) – is marked on it today, open section northeast of Ostrow Mazowiecka.
. GD DKiA
Let us remember that finally the S8 expressway finally goes to Wrocaw with Biaystok, and it is possible that the whole route is passable. 39, here the end of the year On the Wrocaw fragment in Warsaw, there are only two sections southwest of the capital – about 22 km between Radziejowice and Paszkow. rest is ready.As the investor assured us a week ago, quoted by the "infrastructure market", the plans assume that the will be going through the missing fragment before Christmas this year. Probably in the first period in a few places there will still be difficulties due to the completion of the project.
. GDDKiA
***
[ad_2]
Source link