[ad_1]
The account "Saudi Projects" is published on Twitter, a video of one of the Riyadh train project trains, which makes a pilot trip on one of the tracks to make sure that the vehicles and the lanes are ready to operate.
The section indicated that the train was traveling at high speed on the track, while the vehicles were revealed from the inside, where there were a small number of passenger seats, the presence of electronic signs and the internal radio to alert the driver. access to railway stations, as well as the opening and closing of doors.
The King Abdulaziz transport project in Riyadh is the first of the Kingdom, the second public transit project in the Gulf after the Dubai Metro. It includes trains and buses, 6 train lines and 85 stations at a cost of $ 22.5 billion.
Video # Riyadh train Do a test flight on one of the tracks to make sure the vehicles and tracks are ready pic.twitter.com/GmFwulPuB5
– Saudi projects (@SaudiProject) February 22, 2019
[ad_2]
Source link