Restart the control station in the field of Libyan sparks



[ad_1]

An engineer in the sparkling field in Libya said that a control station in the giant oilfield had been restarted, but foreign engineers who were contributing to the field had not yet returned for reasons

In an attack by an unknown group more than a week ago, which forced the National Oil Corporation in Libya to reduce production.

There is no production figure currently, but the engineer says that production will increase again. The National Oil Corporation, run by the state, said that it expected a production drop of 160,000 barrels But one of the field engineers said later that production had already dropped to less than 100,000 barrels a day in the field, which recently produced 200-300 thousand barrels a day.

The attack of the control station on the periphery of the spark 40 km from the main part of the field

The National Oil Corporation based in Tripoli operates the spark field in partnership with Repsol, Total , OMV and Aquinor, formerly known as Statoil.

The field, located in a remote area In south-west Libya, past security problems, including attacks in which vehicles and mobile phones were stolen.


var js, fjs = d.getElementsByTagName (s) [0];
if (d.getElementById (id)) returns;
js = d.createElement (s); js.id = id;
js.src = "http://connect.facebook.net/en_US/sdk.js#xfbml=1&version=v2.3&appId=1377051052530512";
fjs.parentNode.insertBefore (js, fjs);
} (document, 'script', 'facebook-jssdk')); [ad_2]
Source link