Is this guy working for us these days?



[ad_1]

In Fijat Krajsler, Serb cars have, after two weeks of breaks, aligned the production on banal demands, restarted the mountain tracks.


Source: Today

(Image: Getty images)" />

[4,100,000] With a belt fall of 410 cars a day

Although no information is available, it is estimated that 39 In previous months

FCA Serbia will work until Tuesday 17 July, followed by a further halt in production that is expected to last until the end of the month. scheduled for ten working days but the plan has meanwhile changed and will work seven days. ] (function () {var_fbq = window._fbq || (window._fbq = []); if (! _ fbq.loaded) {var fbds = document.createElement ("script"); fbds.async = true; fbds.src = "http://connect.facebook.net/en_US/fbds.js"; var s = document.getElementsByTagName ("script") [0]; s.parentNode.insertBefor s (FBD, s); _ fbq.loaded = true}}) (); window._fbq window._fbq || = []; window._fbq.push ([“track”,”6022054961321″,{“value”:”0.00″,”currency”:”EUR”}]);
[ad_2]
Source link