Vesic: We will all be proud of Belgrade's new Belgrade Boulevard



[ad_1]

Tanjug |

04 July 2018 12:10 |

Komentara: 0

Deputy Mayor Goran Vesic recalled that Belgrade gets a new boulevard built under the project "Belgrade on the water" and was named by the old name of the 39, former US president of the city

Goran Vesic Today, Belgrade obtains a new boulevard built as part of the project "Belgrade on the Water" and adopted by the Belgrade Assembly under the name of former US President Woodrow Wilson.

He is the guest of TV Pink and announces that the boulevard should be completed in March of next year "

" This way, this move will be connected to Bulevar Vojvode Mišića, more precisely at the future roundabout to be built here, parallel to Savska Street, the boulevard will be able to go to Karadjordjevo Street, Vesić said.

It will be an alternative to drivers at the same time, he added, while Savski trg works, because Sava Street will be partially closed on

Read more – Bulevar Vudrou Vilsonu, monument to the patriarch Pavle, legends of basketball

"The Bulevar will be the largest in Belgrade, with six lanes, two bike paths, avenues.We will all be proud of what it will look like," said Vesic

. The reconstruction of the Sava Square should begin in November, and also thanks to the money invested by the investors of Belgrade

"This space will be circular.

VESIC ANNOUNCES THE RECONSTRUCTION OF SVETOGORSKE, TAKOVSKE ..

Deputy Mayor of Belgrade, Goran Vesic, announced today that reconstruction of the sea will begin during the summer, Svetogorska, where the road will begin to operate on July 10. 19659005] After the completion of Svetogorska, Vesić emphasizes that the renovation of the lower part of Takovska, from streets on 27 March in Jaša Prodanović, will begin, will be completed before the start of the new school year, 3 September

"We are trying to rebuild big streets during the summer months when there is less traffic, when part of Belgrade goes on vacation, schools do not work," says Vesić for TV Pink

He also It announced that the reconstruction of Kneginje Zorke Street, King Alexander Karadjordjevic Boulevard in Makenzijeva, will begin on 20 July.

Friday, June 6, Vesic, be released in the Bulevard traffic of Prince Aleksandar Karađorđević, who stands out even 22 days before it was planned.

"The works are also in the Boulevard of Oslobodjenje, and will be completed on September 1, emphasized Vesic.

He pointed out that Smederevski's bet was released Tuesday in traffic, which passes from the center from Grocka to Smederevo, where, on Friday, the bridge was resumed and the traffic was stopped.

More – Vesic in the extraordinary control of the works at Rakovica

"From the cars at night, they can use a direct connection from the center of Gorca to Smederevo, and now we start to design a bridge to get a new bridge as soon as possible. Vesić.

He announced that the decision on the selection of the best contractor for the reconstruction of the Republic Square will be signed Friday, and on July 15, he says, will be issued a building permit.

"The works on the Republic Square begin in the first Speaking of the works planned in the project" Belgrade on the water ", Vesić stresses that the aspect of this part of the city will be completely changed , because the main railway station will become the Museum of the History of Serbia, with a focus on medieval Serbia.In the part where today are perioni, a gallery of art will be built and the reconstruction of the Sava Square will begin in November

"The art gallery and the Savski trg will be made with the money of the company" Beograd na vodi ". The Sava Square will be decorated as a circular square around which the trams will circulate, and in the center of the square will be a monument to Stefan Nemanja, which will be inaugurated on June 28th. "

At the end of the year, he announced the Belgrade Water Park, which will extend over two hectares and that will be, says the largest and most beautiful park from Belgrade.

[ad_2]
Source link