Tepláři also works in the summer and is preparing for a new heating season



[ad_1]

Photo illustration. Photo: TASR / AP

Bratislava, July 30 (TASR) – Fireplaces operate in the summer and prepare for a new heating season. Preparations begin immediately after the end of the heating season, which ends on May 31, according to the decree. The heaters use the summer season for regular inspection and maintenance of heating systems when the effect of downtime on customers is the lowest.



During the hot summer months, guests are often faced with hot water closures. A regular off-season hot water shutdown is required due to the overhaul and maintenance of all production and distribution facilities. During the year, they are constantly in operation. Due to regular revisions and maintenance, the heat pump pre-emptively prevents unexpected breakdowns or accidents.

In summer, when the heat is low, both heat generators and heat generators make renovations and financial and time-consuming investments to disrupt the comfort of the buyers associated with the supply. The heat was as small as possible. In addition, trouble-free operation throughout the year allows the maintenance of a hundred other minor repairs.

"Our investment is aimed primarily at reducing heating costs for customers, increasing the efficiency of thermal systems and saving primary energy. First of all, the thermal equipment is modernized and modernized, new technologies are introduced and extended, which has a positive impact on the efficiency, the reliability and the safety of the whole production system. and heat supply for end consumers. "

system upgrades and control shipments, downtime has significantly reduced and continues to be shortened.In the past it was common that the shutdown of the 39 hot water lasts several weeks.The present time is unique in that the boilers are trying to reach the customers as much as possible.The hot water drains only last a few days or so hours in most cases.In some cities, the heat generator has more heat sources available, so during the shutdown of a boiler, the manufacturer can provide heat from the heat source. another boiler

When the heat pump is stopped, the heating system is governed by a law in force, according to which the heat supply can be interrupted only during the time necessary for the maintenance. subscribers are therefore always informed of the exact date of The shutdown information is sent to the heating facility at least 15 days in advance, mainly by e-mail.

Source: Teraz.sk, the news agency of the TASR news agency

[ad_2]
Source link