[ad_1] The Federal Office of Roads (Astra) is considering the construction of a two-storey motorway in the Limmattal of Zurich. With this, the federal government wants to limit or even reduce traffic …
Read More »After the fire: a logistics company takes a stand
[ad_1] The Telebasel News Post of July 28, 2018. After the fire on Friday afternoon, logistics company Rhenus takes position and defends the storage of railway sleepers. A huge column of smoke …
Read More »In Engadine, 30,000 cubic meters of rocks resound in the valley – the dust cloud is gigantic
[ad_1] Falling rocks near Zernez: up to 30,000 cubic meters of rock rumbled in the valley in Engadin bild: Office of Forests and Natural Hazards / Zernez In Engadine, 30,000 cubic meters …
Read More »Hitzesmermer: More cows must be slaughtered
[ad_1] Today it's raining. But drought in large parts of Switzerland changes little. Affected are mostly farmers. They must water their fields a lot more. And drought also has consequences for animals. …
Read More »Big fire in Basel – News Panorama: Various
[ad_1] A former timber warehouse in Flammen was flooded on Friday in the port of Basel. Shortly after 2 pm, the fire of discarded railroad ties was noticed, which was piled on …
Read More »Rhaetian Railway Painted Rails Against Heat in White
[ad_1] What is common in Italy is also tested in Graubünden: the Rhaetian Railway paints rails with white paint so that they heat less and deform. The painting is currently being tested …
Read More »The man is beaten to death in Basel – an arrest
[ad_1] A 41-year-old man died on Saturday night as a result of an attack in the center of Basel. Three suspects were arrested 28.7.2018, 11:36 (nda) After a violent attack on the …
Read More »20 minutes – Police arrest new suspects
[ad_1] A 41-year-old man died on Saturday night as a result of an attack. He had been attacked by several men in the city center. The backgrounds are not clear. The police …
Read More »Cars in front of the Gotthard Dam on 10 kilometers
[ad_1] Gotthard traffic finally got back to rolling. Traffic jams had steadily increased during the night. Shortly before six in the morning, according to the TCS, the maximum waiting time was two …
Read More »The cars pile up in front of the Gotthard over ten kilometers
[ad_1] Shortly before six o'clock in the morning, the maximum waiting time was two hours. Traffic delays on the Gotthard should continue as planned until the evening. bild: tcs Drivers need a …
Read More »