Free ride for 4 months! 6 Dec Open BTS Bearing – Samutprakarn »SpringNews



[ad_1]

Governor of Bangkok Check the preparation area. Before the trial, go to the green line. The Bearing – Samutprakarn December 6th

General Aswin Kwan Muang, Governor, Bangkok. With the agencies involved. Check the availability of the bus. The Green Line will be open to the public during the Bering-Samutprakarn period. On December 6, the Prime Minister will attend the opening ceremony. From Samrong Station. Go to Samutprakarn housing station, which is the destination. Then visit the project maintenance center.

The Bering-Samutprakarn green line is identical to the BTS, currently served by 9 stations, totaling 13 km. BTS staff also said that if it takes about 12 minutes from Samrong station to Samutprakarn station.

Bangkok has ordered 46 new train convoys for a total of 184 bogeys. On December 3, Bangkok will sign the Memorandum of Understanding with Thailand, the Rapid Transit Authority or the MRTA, after approval the transfer of assets and liabilities. More than 50 billion baht of the MRTA in Bangkok.

This project is open to the public for a free trial. From December 6th to April 16th, the tariff will start to be collected. The maximum rate is 65 Baht.

[ad_2]
Source link