[ad_1]
With an authorized solar power plant of about $ 55 million, the electricity needs will be met by 30,000 delegates
Van, who receives the second highest quota among the regions where the electricity is generated. Solar energy can be produced by the Ministry of Energy and Natural Resources.
Akfen Holding plans to begin production of 30 megawatts of GHG in Edremit province in the first phase of 20 megawatts, which is continuing construction of an area of 600 thousand square meters. (Bisesvan)
[ad_2]
Source link