[ad_1]
The Sharjah Public Works Ministry has completed a rubber course to bypass the water canal in Dibba Al-Hasn, at a cost of one million AED, to encourage running in a healthy environment and suitable nature.
The gateway was handed over to the recipient in the presence of several official representatives and residents of the city and the participation of the elderly social services of Dibba Al-Hosn, who expressed their joy to open the gateway to the public.
Sharjah public works department manager, engineer Ali bin Shaheen Al Suwaidi, explained that the department had completed the construction of a rubber track of 3,000 meters and 3 meters wide with poles. lighting equipped with energy saving lamps and a walkway overlooking the rubber walkway. In the city of Dibba al-Hosn.
Al Suwaidi praised the instructions of HRH Sharjah to complete the detailed development plans of the Sharjah emirate, noting that the Department will devote its efforts in the next phase to the improvement of the quality of its work and its completion according to its schedule.
Regarding the materials used in the field, the director of the branch management, the engineer Mohamed Ben Yaarouf, confirmed that most of the materials used in the bridge were environmentally friendly materials leading to freezing and recycling old rubber tires, and that the Department had adopted a deliberate policy in order to carry out these projects. The quality of materials used in the construction of the track and its compatibility with standards adapted to the environment of our region to ensure the safety of practitioners who run.
He added that the course is respectful of the environment and offers all the safety and comfort required by the risks of falling and the high resistance to weather and heat. The project will contribute to providing appropriate alternatives to encourage the townspeople to go running. Covering all areas of the emirate and achieving a number of strategic goals, including the provision of sports facilities for the population and the integration of the city, as well as the Department plan to provide appropriate alternatives, encouraging residents of Sharjah to practice their leisure, highlighting that Sharjah Public Works Department, Ministries involved in the implementation and design of the study and several projects in residential neighborhoods and the establishment of a number of new parks, enter the circle of projects aimed at providing vital places and recreational areas for residents of residential plans.
The Public Works Department of Sharjah has recently completed the layout of the park in the west district of the city, which covers an area of 40, 000 square meters, and the cost of development work of 2.7 million of dirhams and included the construction of a building on an area of 236 square meters. A dining room for the cafeteria, kitchen and toilets, as well as the completion of the construction of a rubber inner track surrounding the park, of a length of 786 meters and 39 meters. a width of 4 meters, and the rest of the work related to electricity, water and other services of the building.
Source link