To ease the congestion of the entrances of the world city next Saturday



[ad_1]

The Authority of Roads and Transport (RTA) announced the opening of the first phase of development of Al Aweer Street and entrances to the international city on Saturday, July 14, in coordination with Nakheel, principal promoter of the international city project. And the Chinese market, especially after the opening of the Chinese market expansion project and increase congestion in the region.
The Managing Director and Chairman of the Board of Directors Mattar Al Tayer said that the opening of the first phase of the development of Al-Aweer Street will contribute to the smoothness of traffic. The estimated capacity of the bridge is about 1000 vehicles per hour, thus reducing the traffic pressure on the roundabout located between Al Aweer Street and Sheikh Zayed bin Hamdan Al Nahyan Road and facilitating the arrival Hatta travelers on the other side of the street. Al-Aweer to the Chinese market and the international city.
Al Tayer added that the project execution company was close to completion of the main works of the project to increase traffic on Al-Aweer Street from Sheikh Mohammed Bin Zayed Road to Sheikh Zayed Bin Zayed Road. Hamdan, and improve the movement of the back and left traffic of the international city and the Dragon market through the implementation of a free intersection between Warsan 1 and Al-Aweer, consisting of a two-way bridge to provide direct traffic from Worsan Street (1) The tour will also provide visitors to Al Aweer Street at Sheikh Mohammed Bin Zayed Road, as well as free traffic to Hatta from Dubai via Al Aweer Street, directly to Worsan Street ( 1) Through a single-lane bridge, the project also includes the establishment of a parallel service street Al-Aweer Street with three lanes in both directions on Al-Aweer Street for traffic and its separation from the international city, Dragon Market and Al-Warqa.
The project includes the development and transformation of the four major circles of the Cité internationale. , And expanding the current track by adding one or two tracks in certain areas.
The Commission is currently implementing the second phase of the development of Al Aweer Street and the entrances to the international city, where improvements are being made to Manama Street, Intersection of Manama Street with Sheikh Mohammed Bin Zayed and Al Madina International Highway Interchange (1) The main entrance to the international city, with Manama Street.
Development of the intersection of Manama Street and Sheikh Mohammed bin Zayed Street, the expansion of the upper bridge on Sheikh Mohammed Bin Zayed Road three-lane four-lane in each direction, so as to Increase the capacity of the bridge from 4500 vehicles per hour to 6000 vehicles per hour, and also increase the number of runways of the Ras Al Khor round in Sharjah, and the international city to Jebel Ali and Abu Dhabi, and will contribute to doubling the capacity of the tracks from 800 vehicles per hour to 1600 vehicles per hour.
Manama Street will be expanded in the area between Sheikh Mohammed Bin Zayed Road and the entrance to the International City, from three roads in each direction. The expansion of Manama Street in the area extending from the entrance of the international city to the University City Road two roads in each direction to five roads in each direction, and should contribute to an increase in capacity of about 1500 vehicles per hour. This expansion will help increase energy The second phase also includes the development of the intersection of Manama Road and the entrance to the international city, turning it into an intersection illuminating the light and emitting light. light with a three-way air bridge. Enable the passage of traffic on Manama Road, thus contributing to an increase in capacity of about 4500 vehicles per hour.The current intersection of Manama Street and Worsan Street (1) will also be landscaped from an intersection reserved for Al Manama Street. At a controlled intersection The light signals allows movement in all directions with the establishment of a two-lane overpass to serve the traffic of Warsan Street (1) left to University Street University freely , and will contribute to the project to increase the capacity of the intersection at a speed of 3000 vehicles per hour.

[ad_2]
Source link