[ad_1]
Photo: fckarpaty.com.ua
In Lviv, it is planned to rebuild the stadium "Ukraine". This is stated in the well-known detailed plan of the territory bounded by Lipova Avenue and the park "Snopkivsky", which they intend to approve after public hearings.
Read also: The FC "Karpaty" has obtained special conditions for the lease of the stadium "Ukraine"
Number of seats at the stadium will increase from more than 28 to 15 thousand. In addition, in the stadium will be equipped with rehabilitation centers for athletes, catering establishments, office buildings of the Karpaty football club, a club museum and two hotels for 50-60 and 80-100 seats for the reception invited teams.
All objects of infrastructure will occupy no more than 3-4 floors of premises supported with a total area of << 26,600 square meters. For the athletes, the changing rooms will be equipped with showers, a control room, a press area, a press conference room, booths, a VIP stand, a press room, a TV studio and a radio booth. .
The plot in the park "Snopkivsky" must be secured for FC "Carpathians".
See also: 50% of FC Karpaty were put up for sale for the hryvnia
For the purpose of the stadium, it is planned to create 1263 parking spaces: an open parking on the stadium territory for 103 parking spaces, underground parking with 310 parking spaces and parking on the north side of the upper training grounds for 300 seats, as well as on the neighboring territory will also be equipped with a multi-level car park with the possibility to go on Stus street for 400 parking spaces.
The reconstruction is planned for 10 years. The top five will build training grounds and sports facilities on Lion's Lane, as well as a children's sports school near Snopki Park. The reconstruction of the stadium, the construction of parking lots and the reorganization of the transportation network around the stadium should be completed
Earlier, Karpaty FC had called on the RMT to develop appropriate urban planning documentation to enlarge the stadium. .
Reference [19659006] The "Ukraine" stadium was built in 1960-1963 in the 20th century and opened on August 18, 1963. In 1999, it rebuilt and changed the plastic wooden benches and reduced the number of seats.
[ad_2]
Source link