[ad_1]
Weather
A mixture of sun and clouds with 30 percent chance of showers this morning. The maximum is 30 C and the minimum is 15 C.
Cyclists
Wind becoming north-east at 20 km / h near noon.
Traffic
Construction of the City of Windsor begins at the intersection of Ottawa Street and Walker Road. The work will begin on Tuesday, July 10 and continue until July 20.
Northbound traffic along Walker Road will be shifted to the left turn lane and serve as a left-turn cross road on Ottawa Street. [19659007] Southbound traffic along Walker Road will be shifted to the most westerly lane and no left turns into public parking will be permitted
Bridges and Tunnel
Ambbadador Bridge: 30 minutes waiting for trucks entering the United States
Windsor-Detroit Tunnel: No delay reported
Blue Water Bridge: waiting 15 to 30 minutes for trucks entering the United States
Gas
Gas sold from $ 1.19 to $ 1.29 in Windsor-Esbad
The dollar
The Canadian dollar closed at 76 The market opens at 09:30
All the information about 6:15 am [19659003] CBC Windsor's Top Stories:
Source link