MSC Seashore Steel Cutting Ceremony



[ad_1]

At the ceremony held at the Fincantieri Shipyard in Monfalcone, Italy, MSC Cruises Executive President Pierfrancesco Vago and Fincantieri General Manager Giuseppe Bono made the first cut steel of this new ship.

The vessel will enter service in 2021. With 169,400 tonnes, the MSC Seashore will be the first of its kind and will further extend the clbad of MSC Cruises Seaside clbad ships with new state-of-the-art features, including: an additional room in the back part; an upgraded MSC Yacht Club that occupies three front decks; sea ​​level specialty restaurants on Deck 8 for outdoor dining and proximity to the sea; a greater number of hydrombadages across the ship; and 200 additional cabins, as well as even more generous public spaces. In addition, Seaside EVO vessels will be equipped with environmental technologies including a selective catalytic reduction system; exhaust gas cleaning technology; state-of-the-art recycling and waste management systems; advanced water treatment systems; and an advanced system for recovering energy and heat, as well as other technologies and measures to further increase energy efficiency.

Pierfrancesco Vago, President of MSC Cruises, said: "With the Seaside clbad, we have put on the market one of the most innovative cruise prototypes: it is the fifth of six models to date, establishing A new standard in the industry Today, just one year after the commissioning of the MSC Seaside, we move to this concept by opening the construction of an even more feature-rich vessel.The MSC Seashore is an example our commitment to bring the most innovative technologies and a technologically advanced tonnage to the sea, which will have the latest and best marine and environmental technologies. "

Giuseppe Bono, CEO of Fincantieri, said:" The design This boat is the perfect symbol of what Fincantieri has become and what the group represents today in the international market and in the industry in general. designed to impress: first, because of its size, it will be the largest ship ever built in Italy, which will allow us to further increase our management standards, but also by its technological level first. This is a prototype that we have developed on the basis of a unique and extremely successful platform such as Seaside. "Bono then concluded," Beyond that, we are very proud to contribute to the growth of MSC Cruises, a company that is becoming one of the leading players in the market. "

The Event today marks a new milestone in MSC Cruises' unprecedented 10-year development plan, which will include 17 new mega-ships and four new vessels under construction simultaneously. "MSC Seashore is the seventh-built ship according to this plan and will become the 19th boat built by MSC Cruises since its creation in 2003. In addition, the commissioning of the first boat Seaside EVO will bring an innovation in the construction of cruise ships to reach another level of excellence , as was the case with the introduction of the original Seaside prototype.

The MSC Seashore is inspired by the vision of MSC Cruises to navigate in warm waters and an appropriate climate in the environment. It will follow the bold and innovative design of the Seaside clbad, with an immersive walk on Deck 8, which offers guests a wide variety of options for dining and relaxing outdoors. Its name, as for its predecessors, the MSC Seaside and the MSC Seaview, testifies to how to take advantage of the cruise experience, integrated for the first time in the cruising clbad of MSC Cruises, to get customers to the sea.

In addition to offering more space and an even richer experience, Seaside EVO clbad boats will have larger dimensions, even more generous public spaces, more cabins, a larger MSC Yacht Club and will accommodate up to 5,632 guests.

The MSC Seashore will be joined in just 18 months by a second Seaside EVO ship in 2022.

Vessel Technical Specifications

Length / Width / Height: 339 m / 41 m / 74 m

Gross tonnage: 169,400 GT.

Guests: 5,632

Crew: 1,648

Guest Cabins: 2,270

Top speed: 21.8 knots

Delivery Date: 2021.

The 19th Cruise ship will join the fleet of MSC Cruises since its creation in 2003

First developed version of the Seaside clbad.

Hours of manpower required for the construction of the ship: more than 10 million

Number of Fincantieri employees involved in the construction: up to 4,000

Double ship : second Seaside EVO vessel scheduled for 2022

] [ad_2]
Source link