Schwager Wins a Project to Power SQM's New Iodine Plant – Noticias



[ad_1]

Chile

Two power plants and a control room will be part of the project to produce 11,000 tons of ore per year from the end of 2019.

  project-m²-factory-iodine-equipment -schwager [19659004] Monday, October 22, 2018 .- </strong> SQM has just acquired for the equipment of its project "New Victoria Iodine Plant" the installation of two electrical rooms and one room which will be equipped by Schwager and together will produce 11,000 metric tons of iodine per year. </p>
<p>  The facilities site will be located next to the current plant in Nueva Victoria, 120 kilometers from the city of Iquique. The process includes the fields of filtration, conditioning, oxidation, smelting, refining, prilling, conditioning and gas scrubbing; it also includes general services such as water, air, fuel and electricity. </p>
<p>  Schwager Service Electrical Solutions Division Sales Manager Leonardo Luna points out that, for Schwager, "this project is a milestone because it sets us apart from the industry where we have an exceptional trajectory: copper. In this sense, entering the nonmetallic mining sector helps us diversify and generate opportunities in the portfolio of projects with new trends and needs. "</p>
<p>  <strong> High Technological Standard </strong> [19659005"Thehallswillincorporate400-voltpowerdistributionsystemsandmotordrivelinesallwithahightechnologicalstandardthatwillmakethenewinstallationsmorerobust"</p>
<p>  Similarly, in the field of electrical distribution, Schwager will provide the center of load distribution and the conduit of the bar, thus allowing the circulation up to 3,000 A from the substation, thus powering the plant and its equipment. "The new equipment will be available from February 2019, ready to be powered and to start services," says Luna. </p>
<p>  Portal Minero </p>
<p>  <strong> Portal Minero </strong></p>
</div>
<div style=


[ad_2]
Source link