Transantiago expands and modifies roads to better connect with metro: measuring the benefits of 45,000 users



[ad_1]

The Ministry of Transport and Telecommunications (MTT), through the Directory of Metropolitan Public Transport (DTPM), announced further changes to the general grid of Transantiago bus lines, in order to have more connectivity with the Metro System

The changes made – which will benefit more than 45,000 users and will begin to operate from July 7 – continue to enhance the integration of modes, especially to increase connections between the buses and the metro.

The changes will favor 27 municipalities of Greater Santiago: Cerrillos, Ñuñoa, Macul, Florida, Puente Alto, Peñalolén, Santiago, San Miguel, San Ramón, La Pintana, St. Bernard, San Joaquin, La Granja, Pedro Aguirre Cerda, Lo Espejo, La Cisterna, Providencia, Quilicura, Conchali, Recoleta, Pudahuel, Quinta Normal, Cerro Navia, Prado Lo, Maipú, Central Station and Vitacura, one of the services that will strengthen the integration between the two is the I25, which will provide a direct link to the inhabitants of Cerrillos with metro line 6, especially for users of Villa Cardenal Silva Henríquez and the population of Los Presidentes.

"We are implementing changes that seek to strengthen the sense of integration of Transantiago.The I25 service will allow more residents of Cerrillos and the overlying sector to access line 6 These changes respond to a changing city, adapting the system to user requirements and this flexibility is what will inspire the new call for proposals from the system we are working on, "said Minister Gloria Hutt. Transport and Telecommunications

The arrival of the line 114 to the Ñuñoa metro also appears as an important modification, which will allow the users of this service to improve their travel times, in combining directly with the metro.

Regarding the rest of the changes, the roads and extensions, which will not only allow the system to expand in coverage, but to take advantage of the new road infrastructure, just like the 307th service, thanks to the new Lo Marcoleta-Autopista Central connection.

Transantiago reiterated that it places the free telephone service (800 73 00 73, from fixed lines) and 600 730 00 73 (from cell phones or regions), as well as the Twitter account of the company, @transantiago

In total, there will be 10 specific changes, including extensions, layout changes and the new I25 service, which are detailed below:

I25 Delivery link to Villa Cardenal Silva Henríquez and to the Population Los Presidentes, in the municipality of Cerrillos, up to line 6 – (M) Cerrillos –

Modifications of roads / routes:

114 [19659011] It seeks to improve the frequency and enjoy the connectivity of the system, maintaining in Metro Ñuñoa
307th It seeks to reduce travel time, taking advantage of the new connection allowed by Lo Marcoleta, in the municipality of Quilicura. services 315e and 307.
J05 Seeks greater speed of use of the Serrano axis in the municipality of Cerro Navia, improving the coverage of the inhabitants of towns such as La Alianza and Villa Bicentenario.
J20 Search more speed, using the Serrano axis in the municipality of Cerro Navia, improving coverage for the inhabitants of cities such as La Alianza and Villa Bicentenario.

Modifications of the head

230-207e-209-209e Are eliminated goes on the public roads, inaugurating a terminal to Camino El Retiro, improving the working conditions of the drivers and the dispatchers. In addition, a new coverage with 209 and 209th services by south access wedge.
H05 Modification of head, located in the municipality of Pedro Aguirre Cerda, to improve the working conditions of drivers and dispatchers.

                                

[ad_2]
Source link