Egyptian Politics – Details of the Power Station to Be Opened Tomorrow by "Al-Sisi"



[ad_1]

You are currently watching the news – Egyptian Politics – Details of the Power Station to Be Opened Tomorrow by "Alissa"
In the News – News Horizon News
The Ministry of Electricity announced Tuesday the completion of special preparations for the opening of the largest and largest wind farm of Jabal El-Zayt in Ras Gharib, north of the Sea Governorate Red, at a cost of 12 billion pounds on Tuesday, July 23, 2018. To be inaugurated by President Abdel Fattah Al Sisi through the video service Canfrance, in 3 new power plants.

The site of the largest and most recent wind farm

The station will be open along the west side of the Hurghada coastal road, Jebel Zit 3 district, and is the largest and most recent farm. includes 290 turbines from the latest turbines in wind farms around the world. The total capacity of the Jebel El Zayt wind power plant is 580 megawatts, with a production rate of 2 megawatts per turbine, the first project includes 120 turbines with a capacity of 240 megawatts, the second includes 110 turbines of 39, a capacity of 220 megawatts.

The third project includes 60 turbines with a capacity of 120 MW, which contain a monitoring system for birds that migrate through the radar to stop the turbines when they pbad and restart after the pbadage, system used for the first time in the world.

The station comprises three administrative buildings, including the station control building, which was created and designed according to the latest international standards and latest possibilities, so that the staff monitors all the turbines and connects to the grid .

[19459006ExperimentalExploitationoftheField

Operational experiments were conducted on all turbines and integrated into the 580 MW wind power network, the largest capacity in the world.

The station's turbine is one of the last wind turbines in the world, the first of its kind in Egypt and the Middle East, and there are electric lifts on the inside to make it easier. Periodic maintenance, but Durnha up to 16 rpm.

The advantages of strategic location of the farm

The site of Mount Jezit station, one of the best sites in the world to invest in wind projects, and the wind speed is between 12 meters per second and 33 meters per second, And the Jebel El Zayt factory production rate reached a world record, reaching 52% of the total capacity of the factory, while the conventional global average is 30-40%, up 10% from the global average. Attract the investor on these projects, whose return comes after 6 years of Tash 100%.

Thank you for visiting us to see the subject of Egyptian policy – the details of the electricity production plant that will be opened by "Al Sisi" tomorrow and we hope that we will provide you with this service . "Al Sisi" will open tomorrow. "We have no responsibility to read the news from its original site from the Egyptians site, and you can follow the latest news and news through our website.Always by visiting the link" http: //www.alufuqnews.com "Or by typing" Horizon News "in Google and you will be redirected to our site immediately, God willing.

] Words of the Bible
Policy Reports
News
Political issues
New policies
News and reports
Local reports
Egyptian reports
[Jsid=id;jsasync=true;jssrc=”http://connectfacebooknet/ar_AR/alljs#appId=&xfbml=1″;dgetElementsByTagName('head')[0] .appendChild (js);} (document)); [ad_2]
Source link