The rider crossed the Medan-Tebing Tinggi toll road project in Serdang Bedagai, North Sumatra, on Sunday (18/6). – 19659003] JAKARTA – The operating project of Section 1 of Medan-Kualanamu-Tebing Tinggi should contribute to the economic development of the region.
Secretary General of PT Jasa Marga Tbk. Agus Setiawan said that the existence of the Medan-Kualanamu-Tebing Tinggi Highway (MKTT) should also increase connectivity to facilitate distribution and reduce logistics costs of goods and services.
The existence of the toll road will shorten the travel time of Kualanamu Medan or vice versa, that is to say from about 2 hours to just 45 minutes.
"We hope that after this operation, this toll road can contribute to regional economic development," he said Sunday in a statement. 2018)
Agus reported that section 1 of the MKTT toll road (SS Tanjung Morawa-SS Parbarakan) had functionally operated since early June 2018 as a functional route for the return to and from Lebaran 2018. [19659002TanjungMorawa-SSParbarakanis1075kilometerslongandisreadyforaction
Section 1 of the MKTT toll road will connect the existing jal route Belawan-Medan-Tanjung Morawa (Belmera) with the Medan-Kualanamu-Tebing Tinggi section of 2-6 (Kualanamu-Sei Rampah) which was in operation since October 13, 2017.
The MKTT toll consists of seven sections of a length of 61.7 kilometers and is built at the cost of Rp 4.90 trillion. The case is carried out by PT Jasamarga Kualanamu Tol as a subsidiary of PT Jasa Marga (Persero) Tbk.