[ad_1]
MOUNTAINS AT THE ZOOM –
The four victims seriously injured Monday morning during the explosion in the center of Bergen op Zoom are out of danger. This is reported by Enexis, the employer of three of the victims, and Desiree Reijpert, vice president of the school community's Rijks, where the fourth victim goes to school. All victims were taken to the Rotterdam hospital immediately after the explosion. They are always there.
One of the victims is a student of Rijks. He is in his mavo exam year. He was going to school by bike and overtook the transformer at the time of the explosion. The witnesses saw how he literally blew his bike. According to Reijpert, the boy has mainly burns on his face and hands. "But he is happy outside the danger of life."
ALSO READ: "A huge mass of fire crossed the street", eyewitness to the house of the explosion transformer
In college, they are deeply shocked, says Reijpert. There is help and advice for students and teachers. When the boy did not show up at school, the management called the parents to ask where their son had stayed. So they quickly discovered that he was one of the victims of the blast. To express their support, the students wrote cards. Tuesday afternoon, Reijpert himself goes to the hospital in Rotterdam.
ALSO READ: Four serious wounded after an explosion in a processing workshop in Bergen op Zoom
"A terrible workplace accident"
The three employees of Enexis are also out of danger . They were informed of a malfunction Monday morning. When they arrived at the transformer, they saw smoke coming out from under the door, after which they took a little distance. According to a spokeswoman for Enexis, the explosion followed about twenty seconds later.
In Enexis, the fear is good. "It's a terrible work accident." The employees have burns, we also left a broken shoulder to the shot. At present, the Labor Inspectorate is conducting research on problems occurring in the transformer.
ALSO READ: A power outage was solved after the explosion in a transformer shop: "Bergen op Zoom looked like a ghost town"
Part of downtown was without electricity, this problem has now been resolved. Enexis installed a new transformer.
Source link