Accelerate to build the extension of the yellow line Ratchada – Ladprao – Ratchayothin. Stick 2 stations, 4 electric railway



[ad_1]

  1. Accelerate the construction of the extension of the yellow line Ratchada – Ladprao – Ratchayothin. Stick 2 stations, 4 electric railway
  2. MRT to listen to the extension of the yellow line
  3. Complete cover

[ad_2]
Source link