The content of Kingdom Hearts 3 will last more than 80 hours, the length of the critical path is also revealed



[ad_1]

Kingdom Hearts 3 is one of those games that everyone loves, mainly because it brings a mix of everything. With so many details emerging from time to time, the biggest has recently surfaced. Although most fans were already waiting for this, now it has been confirmed that Kingdom Hearts 3 The content will last longer than 80 hours.

Based on the word of Geek.com, players can expect more than 80 hours of Kingdom Heart 3 Content, which includes a Ratatoullie-based cooking game, with 20 different toys / old school tiger games as well as side scrolling games in 2D. That said, 2D side-scrolling games are based on Mickey cartoons from the 1930s and 40s.

Adding to that, the particularity of Kingdom Hearts 3 is that if you stay on the critical path of the game, it will take The Square Enix representative confirmed it.

So, all of this means that if we include all the mini-games and the main game, the content of Kingdom Hearts 3 will last the player with more than 80 hours. It is undoubtedly something exciting.

With all that is said for those who are interested, Gamestop is driving up excitement as they offer a special pre-order bonus for Kingdom Hearts 3. Get an exclusive Disney poster with a pre-order from this Gamestop game

We took notice of this pre-order bonus, when Gamestop took on his Twitter account and proclaimed that for those who pre-order this game now, will get an exclusive poster

So It would be the perfect time to benefit from this bonus offer, either, if you want to check all the characters and characters confirmed in the game until now, you can certainly do it.

Kingdom Hearts 3 is scheduled for January 29, 2019, for PS4 and Xbox One.

[ad_2]
Source link