According to a note from the Ceará Infrastructure Secretariat (Seinfra), the construction company's responsible tunnel crews are in the site, inspecting the pumping system and draining the water. 39; water.
The disturbance is the result of a rainfall of more than 117 mm at Fortaleza, causing the flood of the tunnel in Borges de Melo Avenue, officially delivered last Monday, 2. Although, early morning With only two kite trucks in operation, three others have already been positioned to pull out all the water. The tunnel will be released as soon as the service is completed.
AMC agents are in the area, guiding the drivers and, according to the Central of the body, the traffic flows normally, with gaps on both sides of the path.
One of the main objectives of this work is to allow the light rail vehicle (VLT) to pbad constantly through the Fatima section.
Redaction O POVO online