The rejection of Brumadinho can reach hydropower in two days – 25/01/2019



[ad_1]

Furnas, a public company of the Eletrobras group, monitors the arrival of Brumadinho dam (MG), which erupted on Friday (25) on the hydroelectric dam of Retiro Baixo,

The dam of the power station Retiro Baixo hydroelectric, confirmed the National Water Agency (ANA), is located 220 kilometers from the site of the rupture and "will allow the depreciation of discharges". According to ANA, "it is estimated that this wave will reach the factory in about two days".

  Arte / UOL
Image: Arte / UOL

The Paraopeba River is part of the São Francisco River Basin. The Retiro Baixo hydropower plant is located between the municipalities of Curvelo and Pompeu. The factory has two turbines in operation, with an installed capacity of 82 megawatts, of sufficient energy to serve 200,000 inhabitants, and operates since 2010. Its reservoir of 22 square kilometers.

As a note, ANA reported that she is in constant activity. communication with state and federal authorities and authorities, including in the context of the recent Dam Safety Cooperation Agreement, which allows for easier and faster information exchange on the situation on the event site.

"ANA monitors the Reject waves and coordinates actions to maintain water supply and quality for cities collecting water along the Paraopeba River," he said. declared. "The inspection of the broken dam, the accumulation of tailings, is the responsibility of the authority that grants the mining rights," said the agency, citing the national mining agency (ANM)

. [ad_2]
Source link